Engineering
Aerospace · HR and IT
Eleven intranet processes rebuilt
Eleven request journeys out of the old intranet — from SharePoint Classic to SharePoint Online, with the forms and workflows rebuilt.
- Duration
- ~8 months
- Budget
- 20.000 – 50.000 €
- Project team
- MQC 3 · Client 2
End-of-project survey
This client did not answer our end-of-project survey — so there are no scores to show.
The brief
- Rebuild the eleven existing request and approval processes with a new toolset
- Carry the legacy data over, so that operations continue without a break
The build
- Only the list schemas survived from the old solution: site architecture, forms and workflows were designed again from scratch
- Power Apps and Power Automate for the forms and approvals, with Adaptive Cards in Outlook, automatic reminders and Azure PowerShell scripts for provisioning access
- Modern SharePoint list formatting for how the data presents
The good
- Visibly modernised, and every process got a logo of its own inside one consistent design across all eleven journeys
The bad
- Eleven largely similar processes side by side are hard to keep straight: a fault fixed in one workflow would surface in the same shape somewhere else, which made maintenance slow and repetitive