Insights
Construction · IT
Power BI Tenant Migration Planning
A full analysis of an existing Power BI and Fabric tenant, and the plan that moved it into another one.
- Duration
- ~4 months
- Budget
- < 20.000 €
- Project team
- MQC 5 · Client 20
End-of-project survey
This client did not answer our end-of-project survey — so there are no scores to show.
The brief
- Analyse the existing Fabric tenant and produce instructions for migrating workspaces, permissions, connectivity and datasets into the new one
- Carry the on-premises gateway across and get it working again
- Close with user testing rather than with a handover document
The build
- Extracting everything needed through the Fabric admin API, then working through the workspaces and reports one at a time for status and migration
- Moving the existing Power BI gateway jointly with the customer and bringing it back into service
- Coordination with the project team and the individual report owners throughout
The good
- Everything was migrated, and unnecessary reports and workspaces were cleaned up on the way
- Some workspaces moved onto capacity and gained visibility across the company as a result
The bad
- Moving an existing Power BI gateway without administrative rights on the target side was a tedious process against a very restrictive target tenant